Middlemount Coal Site Induction Booking Request Logo
  • Middlemount Coal Site Induction Booking Request

  • This Site Induction Electronic Booking Request Form is to be completed by the contractor company requesting the induction. Once approved, a pdf version of this document will be forwarded to you and is required to be submitted via the Contractor Portal for approval and final processing of the induction application. For support with the induction process, contact the Pegasus Middlemount Coal Compliance Team on 1300 306 384 or middlemountcoal@pegasus.net.au.  
  • Administrative Contact Details
  •  -
  • Candidate Details
  •  - -
  •  -
  •  -
  • Candidate Job Scope
  •  - -
  • Documentation Requirements / Pre-Requisites
  • Original documents or certified true copies are to be uploaded into the Pegasus Contractor Portal when requested. The following is required as a minimum for enrolment into the site induction Standard 11 Statement of attainment (S11 Card alone is insufficient) Coal Board Medical (less than 5 years old - section 4.3 review date must not be expired) Current Drivers Licence / Proof of Identity Approved Site Induction Booking Request Form Resume New inductees are also required to supply a Drug & Alcohol Test that is no more than 14 days old from date of induction application.
  • Minimum Site PPE Requirements
  • High Visibility Long Sleeve Shirt (Or reflective vest for non-high visibility clothing) Long Cotton Pants Lace Up Safety Boots with Metatarsal Protection (No elastic sided boots or external metatarsal guards) Hard Hat Safety Glasses
  • Training Needs Analysis
  • Please tick the appropriate boxes specific to your job position requirements at Middlemount Coal  in all four of the training needs analysis sections: Primary Role Authorisations Mobile Authorisations Appointments
    • Approvals 
    •  - -
    • Should be Empty: